Wishbone Gold Plc
Outstanding management
—
Bagger potential
🔒Share price · USD
$0.220
0.165 GBP at 1.3329
- FD shares
- 40.33M
- FD market cap
- –
- Country tier
- Tier 1
- Insider aligned
- 🔒
- Project grade
- 🔒
- Resource size
- 🔒
- Optionality
- 🔒
Resource
- Gold (oz)
- –
- Silver (oz)
- –
- Copper (lb)
- –
Resource equivalent
- Gold (oz)
- –
- Silver (oz)
- –
- Copper (lb)
- –
Scoring inputs
RT scorecard
Available to MinersDB Members
The RT scorecard is part of MinersDB Member data.
Upgrade to MinersDB MemberDescription
Wishbone Gold Plc is a Gibraltar-incorporated, AIM/AQSE-listed early-stage explorer with a portfolio of gold, copper and silver projects in Western Australia and Queensland. Its flagship Red Setter project lies approximately 20 km southwest of Telfer and hosts a roughly 4 km mineralised diorite trend. The 2026 drilling program was designed for up to 25 RC/diamond holes and approximately 9,000 m, with initial results including 11 m at 0.7 g/t Au from 139 m, including 4 m at 1.3 g/t Au.
The investment case is based on discovery leverage across a large Telfer-area land position, combined with high-grade silver optionality at Silver Lake and Cottesloe. Red Setter benefits from proximity to established Telfer and Nifty infrastructure, while Silver Lake and Cottesloe provide additional silver-rich exploration potential. None of the current projects has a compliant MRE or economic study.
List of Projects:
Project 1: Red Setter, Western Australia
Flagship gold-copper exploration project near Telfer. Drilling has confirmed mineralisation along an approximately 4 km trend, but no current MRE has been defined.
Project 2: Cottesloe / Cottesloe East, Western Australia
Silver-lead-copper exploration targets with high-grade historical results and a long mineralised trend. No current MRE.
Project 3: Anketell, Western Australia
Early-stage exploration project containing an untested magnetic target approximately 1 km across and beginning within 100 m of surface.
Project 4: Silver Lake, Western Australia
Silver exploration project acquired in May 2026. Surface sampling returned grades up to 847 g/t Ag, with historical drilling including 2 m at 150 g/t Ag from 4 m.
Project 5: Telfer North-West, Western Australia
Early-stage geophysical and drill-targeting project approximately 25 km northwest of Telfer.
Project 6: Havieron South-East, Western Australia
Early-stage exploration application approximately 10 km southeast of Havieron, covering part of the Havieron Thrust. Grant is targeted for early 2027.
Project 7: Wishbone II, IV & VI, Queensland
Gold-copper-silver exploration licences in the Mingela area, including Halo and other high-grade surface targets.
Project 8: White Mountain, Queensland
Early-stage project with historical gold, silver, copper and antimony workings and multiple exploration prospects.
Weakness
Available to MinersDB Members
The weakness note is part of MinersDB Member data.
Upgrade to MinersDB MemberList of projects
Project details have not been added yet.
Deep dive series
Available to MinersDB Members
The deep dive series is part of MinersDB Member data.
Upgrade to MinersDB MemberTrack progress timeline
Forecast share price
Expected timeline to full production
No replies yet in the Wishbone Gold Plc thread.
Latest company news
Select News to load recent articles.
Company data last reviewed 26 Sep 2026. Price updated 19 Oct 2026 08:00.