Troilus Mining Corp.
Outstanding management
—
Bagger potential
🔒Share price · USD
$1.198
1.690 CAD at 0.7089
- FD shares
- 600.38M
- FD market cap
- $787.5M
- Country tier
- Tier 1
- Insider aligned
- 🔒
- Project grade
- 🔒
- Resource size
- 🔒
- Optionality
- 🔒
Resource
- Gold (oz)
- –
- Silver (oz)
- –
- Copper (lb)
- –
Resource equivalent
- Gold (oz)
- –
- Silver (oz)
- –
- Copper (lb)
- –
Scoring inputs
RT scorecard
Available to MinersDB Members
The RT scorecard is part of MinersDB Member data.
Upgrade to MinersDB MemberDescription
Troilus Mining is a Canadian development company advancing the 100%-owned Troilus gold-copper-silver project in north-central Quebec. The investment case is a large brownfield reserve, completed basic engineering, advanced permitting and procurement, strong institutional backing and substantial leverage to gold and copper prices. The principal trade-off is the US$1.428B construction requirement before commercial cash flow.
The September 2026 NI 43-101 technical report outlines a 50,000 tpd open-pit operation with an approximately 26-year mine life. Proven and probable reserves total 478 Mt containing 6.7 Moz gold, 568 Mlb copper and 14.2 Moz silver. Average active-mining production is 251 koz gold, 20.1 Mlb copper and 466 koz silver annually. After-tax NPV5 is US$3.206B at US$3,600/oz gold, US$5/lb copper and US$50/oz silver.
Basic engineering is complete, while detailed engineering, procurement, permitting and financing are advancing toward a targeted 2027 construction start. Troilus also retains a 2% NSR over 985 km² of former non-core claims transferred to Sayona, providing additional non-core optionality.
List of Projects:
Project 1: Troilus Project, Quebec, Canada — Gold, Copper, Silver
100%-owned 435 km² flagship brownfield project covering the Z87, J, SW and X22 deposits. Basic engineering is complete, with detailed engineering, procurement, permits and financing advancing toward potential construction in 2027.
Project 2: Sayona Transferred-Claims Royalty, Quebec, Canada — Royalty Interest
Troilus retains a 2% NSR over 985 km² of former non-core Troilus claims, including the Tortigny area. Sayona may repurchase the royalty for C$20M under the sale terms.
Weakness
Available to MinersDB Members
The weakness note is part of MinersDB Member data.
Upgrade to MinersDB MemberList of projects
Project details have not been added yet.
Deep dive series
Available to MinersDB Members
The deep dive series is part of MinersDB Member data.
Upgrade to MinersDB MemberTrack progress timeline
Forecast share price
Expected timeline to full production
No replies yet in the Troilus Mining Corp. thread.
Latest company news
Select News to load recent articles.
Company data last reviewed 24 Sep 2026. Price updated 19 Oct 2026 08:00.